Milling and paving to get underway today in Dunkirk

There will be delays...but the work will result in a smoother ride. Road work will get underway this morning in the city of Dunkirk.  H. Olsen and Sons will begin milling operations on Washington Avenue at East 5th Street and head southerly on Washington to East Seventh Street and then move to the 200 block of Park Avenue. Additional streets to be milled will be South Ermine, portions of Beagle Street, along with the 100 block of Robin Street and the 100 block of Deer Street.   The full milling schedule should be completed by the end of the work day on Friday. Paving will follow the milling work and new pavement will also be placed over the hot-in-place reconstructed streets from 2013 and in several other city areas.

comments powered by Disqus
Local Weather
Dunkirk, NY
44°
Keyword Search

Classic Hits 101.5FM - 1410AM & KIX Country 96.5FM - 100.3FM
4561 Willow Road | Dunkirk, New York 14048
Telephone: (716) 366-1410
Fax: (716) 366-1416
EEO Report  |  Public Inspection Files
WDOE, Dunkirk, NY & WBKX, Fredonia, NY
Copyright © 2024 Chautauqua Today
Classic Hits 1410 WDOE, Dunkirk, NY.
Site Designed by RiverBender.com
-->